Zungeru Hydroelectric Power Station is a 700 megawatts (940,000 hp) hydroelectric power plant in Niger State, Nigeria. Construction began in 2013 and was completed in 2023. It is the second-largest hydroelectric power station in the country, behind the 760 megawatts (1,020,000 hp) Kainji Hydroelectric Power Station.

From Wikipedia, under CC BY-SA 4.0

In the Zungeru guide

700 megawatts (940,000 hp) hydroelectric power plant

    From Zungeru, adapted from Wikivoyage under CC BY-SA 4.0

    In the Minna guide

      From Minna, adapted from Wikivoyage under CC BY-SA 4.0

      Where it is

      An unhandled error has occurred. Reload ×