Vianden Pumped Storage Plant

Landmarks

The Vianden Pumped Storage Plant is located just north of Vianden, in north-eastern Luxembourg. The power plant uses the pumped-storage hydroelectric method to generate electricity and serves as a peaking power plant. Its lower reservoir is located on the Our River, bordering Germany, and the upper is elevated above on the nearby Saint Nicholas Mountain. Construction on the plant began in 1959 and the first pump-generators were commissioned in 1962. A tenth pump-generator was installed in 1976 bringing the plant's installed generating capacity to 1,096 megawatts (1,470,000 hp). The plant generates an average of 1,650 gigawatt-hours (5,900 TJ) annually but of course consumes even more. Generally the efficiency of this energy storage method is around 70–80%. The plant is owned by Société électrique de l'Our and RWE. Construction on an eleventh pump-generator began in 2010 and it is expected to be commissioned in 2013, which will bring the plant's installed capacity to 1,296 megawatts (1,738,000 hp).

From Wikipedia, under CC BY-SA 4.0

In the Vianden guide

If you have a taste for major industrial sights or large water basins, and would like to get away from the crowds, hike a few kilometres up along the river Our, until you reach the Pumped Storage Plant. It has two large reservoirs and was expanded in 2013. The total reservoir capacity is about 10,800,000 m³, making it the largest hydro-electric power plant in Europe. It has a visitors' centre, which allows a peek into its underground power plant. It's a pleasant walk, along the water, but uphill.

  • 10:00-16:00, Easter-Sep 10:00-20:00
  • Free

From Vianden, adapted from Wikivoyage under CC BY-SA 4.0

Where it is

Nearby

An unhandled error has occurred. Reload ×