The Maeslantkering 'Maeslant barrier' is a storm surge barrier on the Nieuwe Waterweg, in South Holland, Netherlands. It was constructed from 1991 to 1997. As part of the Delta Works, the barrier responds to water level predictions calculated by a centralized computer system called BOS. It automatically closes when Rotterdam, especially the Port of Rotterdam, is threatened with flooding. Maeslantkering has two 210-metre long barrier gates, with two 237-metre long steel trusses holding each. When closed, the barrier protects the entire width (360 metres) of the Nieuwe Waterweg, the main waterway of Port of Rotterdam. It is one of the largest moving structures on Earth, rivalling the Green Bank Telescope in the United States and the Bagger 288 excavator in Germany.

From Wikipedia, under CC BY-SA 4.0

In the Rotterdam/Hook of Holland guide

A storm surge barrier that is one of the largest moving structures in the world. The Maeslantkering is one of a series of surge barriers, locks, and dikes in the Netherlands, further described in the Delta Works article. The visitors' center (het Keringhuis, €2 per person) explains the history of Maeslantkering as well as the wider context of Dutch water management, but exhibits are in Dutch only. Several times per day, guided tours are provided for €4 per person (most are in Dutch, some in English); check the website for time and reservations. It's also possible to get a good, free view of the barrier from the top of the dune next to the visitors center. Once a year (usually in September), the barrier is closed and re-opened for testing. On that day, the place will be relatively crowded.

  • Havennummer 882
  • Mon–Fri 10:00–16:00, Sat Sun holidays 11:00–17:00

From Rotterdam/Hook of Holland, adapted from Wikivoyage under CC BY-SA 4.0

In the Rotterdam/Port of Rotterdam guide

Storm surge barrier completed in 1997 as the last part of the Delta Works, a plan set in place to defend the low-lying Netherlands against flooding. The barrier gates are able to close off the Nieuwe Waterweg completely, defending Rotterdam against excessive flooding. The barriers are almost always opened, but are closed about once a year around September to verify its workings. It has been closed because of storm surges twice, once in Novembe 2007 and once in early January 2018. The visitors centre is located on the northern bank, in Hoek van Holland.

  • Noordzeeweg 691

From Rotterdam/Port of Rotterdam, adapted from Wikivoyage under CC BY-SA 4.0