The Xiaolangdi Dam (Chinese: 小浪底; pinyin: Xiǎolàngdǐ) is a dam in Jiyuan, Henan Province, China, and impounds the Yellow River. The facility is located about 20 km to the northwest of Luoyang. It has a total installed capacity of 1,836 MW and generates up to 5.1 TWh annually with the help of six 306 MW turbines. The dam stands 154 m (505 ft) tall and 1,317 m (4,321 ft) wide. It cost US$3.5 billion to construct.

From Wikipedia, under CC BY-SA 4.0

In the Jiyuan guide

Visitors can tour and take photos at the Yellow River's large-scale water conservancy projects, and learn about the facilities for water diversion, power generation, and flood control.

  • Xiaolangdi Town
  • about 1.5 hours by car from the city center
  • Free

From Jiyuan, adapted from Wikivoyage under CC BY-SA 4.0

Where it is

An unhandled error has occurred. Reload ×